Ceylon Electricity Board says there will be NO power cuts January 22, 23 and 24th as Ceylon Petroleum Cooperation CPC has supplied required fuel stocks to Power Stations.
One of the 300 MW plants at Norochcholai coal power plant is not functioning and will be repaired by January 25th says Minister Gamini Lokuge.